Skip to main content

Planning Parameters

The Visual Planning parameters are in the following menu item:
Production control > Setup > Planning & Control > Planning parameters


An overview of all the available configuration options in the planning parameters can be found below.


largest

General

ParameterDescription
General
Period unitThis unit specifies the default planning horizon that will be shown from today on forward when a form is opened without any context.
Length of periodThis length specifies the number of periods that will be shown from today on forward when a form is opened without context.
Gantt week numberingIt is possible to configure per legal entity the week numbering.
Locale: Setting the week numbering according to the user locale settings in Dynamics 365.
ISO8601: Setting the week numbering according to the ISO8601 standard.
US: Setting the week number according to the US standard.
Default milestone category(Only applies to Axtension® Project Management).
Close task
Delete capacity reservationsWhen set to yes, the system will remove the capacity reservations for tasks that are marked as “closed”. This will free up the resource to be assigned to a different task.
Posting
Manual completed percentage(Only applies to Axtension® Project Management).
Task planning
Activity planning method(Only applies to Axtension® Project Management).
Multi-edit setting(Only applies to Axtension® Project Management).
Resource planning
Assign tasks to any resourceWhen set to yes, a resource that has non-matching competencies can be assigned to a task after confirming a warning message. This feature allows the user to move a job or operation to an entirely different resource group or a resource that does not meet the resource requirements specified on the route.
Update assignments on publish(Only applies to Axtension® Project Management).
Capacity overview
Project quotation probability threshold(Only applies to Axtension® Project Management).
Critical path
Recalculate critical path on publish(Only applies to Axtension® Project Management).
Default critical path ID(Only applies to Axtension® Project Management).
Store all chains(Only applies to Axtension® Project Management).
Period intervalIn both task- & resource planning the date range that is visualized can be adjusted by selecting two dates. These dates can be selected manually, or you can use the small & large intervals.
Small interval
small
The small interval allows the user to change a date with a single click by days, weeks, or months.
Large interval
small
The large interval allows the user to change a date with a single click by days, weeks, or months.
Sustainability
Bing Maps API Key(Only applies to Axtension® Project Management).
WBS
Convert predecessors(Only applies to Axtension® Project Management).

Colors

Colors can applied on operations within the resource planning. The coloring can be based on the "Order type", "Production group" and/or "Production pool".



largest



The following configuration options are available when setting up the colors.



ParameterDescription
Gantt color
ColorDefine the color that should be applied to the activities that comply with the rules setup below.
DescriptionProvide a clear description that describes when this color is applied.
Projects
(Only applies to Axtension® Project Management).
Production
Order TypeAll: This color setting applies on all order types.
Production order: This color only applies on production orders.
Planned production order: This color only applies on planned production orders.
Simulation order: This color only applies on production orders part of a simulation.
Valid for > Production GroupAll: This color setting applies to all production groups.
Table: Production group: This color only applies to the selected group.
Valid for > Production PoolAll: This color setting applies to all production pools.
Table: Production pool: This color applies to the selected production pool.
Route/job typeThe color applies to the select route/job type. If left blank, it applies to all route job/types.

Resource planning

(Only applies to Axtension® Project Management).



Item tracking

Within the task planning and resource planning item tracking can be shown by enabling the "Show item tracking" parameters in the chart preferences. The behavior of the item tracking icon can be configured within the planning parameters.

ParameterDescription
Check item availability
Requirement fulfilled whenPhysical reserved: the system will show that the items tracked on the BOM are available when the inventory is physical reserved and on-hand.
On hand in time: the system will show that the items tracked on a BOM are available at the required date of the operation.
On hand available physical: the system will show that the items tracked on a BOM are currently available.
Purchase / Production fulfilled whenItems will be shown as available when
Complete: all items are (reserved and) on hand.
Part delivery: some of the items are (reserved and) on hand.
Automatically recalculate item availabilityWhen set to Yes, the system will constantly validate automatically if the items, linked to an activity via item tracking, are available.
When set to No, the validation of item availability needs to be manually initiated.
Plan for item trackingWhen item availability is validated and there is no reservation, the master plan identified in this field will be used to check on “delay’s”.
Item requirements check
Default(Only applies to Axtension® Project Management).
Item requirement date update(Only applies to Axtension® Project Management).
Item requirements
(Only applies to Axtension® Project Management).
Items
Item model groupShow the item model group.
Automatically trackSelect the item model group(s) that should be tracked in the resrouce planning by enabling the “Automatically track” parameter. Only items that are set to “Automatically track” on the BOM are visualized.


Production

When using the Axtension® Production Planning solution multiple configuration options are available to setup the production planning.



largest


ParameterDescription
General
Use color from production orderNo: Color defined in these parameters will be applied.
Yes: If there is a color specified on the production order, this color will be used for visualization.
Preferred color selectionIf there is a color configuration conflict, define which setting will get the preference.
Visualization Task planningVisualize jobs as operation: If job scheduling is executed, the task will be visualized as a single bar in resource planning. In this scenario al jobs will remain attached to one another.
Visualize jobs separately: If job scheduling is executed, the jobs will be shown as individual tasks and can therefore individually be rescheduled.
Visualization Resource planningVisualize jobs as operation: If job scheduling is executed, the task will be visualized as a single bar in resource planning. In this scenario al jobs will remain attached to one another.
Visualize jobs separately: If job scheduling is executed, the jobs will be shown as individual tasks and can therefore individually be rescheduled.
Production status
Status / Allow dragAllow to reschedule a production order only when it complies to these configured statuses. All but reported as finished is best practice.
Job priority
Priority / VisibleDefine which job priorities are shown in the resource planning. Within the task planning all job priorities are shown. Primary only is the preferred setup.
Job types resource planning
Route/job type, VisibleDefine which job types should be shown during resource planning. Setup & Process time is best practice.
Configure task information
This allows for configuration what information should be displayed on the job/operation, in the tooltip (when you hover over a task with your mouse) and on the description (show in the grid).
TypeSelect for which type of order the setup should apply:
Production operation: an operation or job of a production order.Planned production operation: an operation or job of a planned production order – result of MRP.
InformationSelect what information must be shown for the operations:
smallest
Task description: The description of an operation displayed in the grid on the left side of the screen in the resource planning.
Tooltip The description of job/operation when you hoover over a task.
Task name: The description of the operaration in the resource planning
Configure descriptionSelect the fields that should be shown and change the order with the up and down buttons.
smallest


Gantt control table setup

The columns in the left pane of the resouce and task planning can be configured. This will make it easier to for example show the WBSId or dates for the shown operations.


largest


ParameterDescription
Task planning columns
Column nameActivity field that should be displayed.
Width in pxNumber of pixels that should be used to show the information.
DescriptionDescription of the column name.
Visible columnsSpecifies the number of displayed columns (more columns can be displayed by adjusting the width of the task planning columns).
Resource planning columns
Column nameActivity field that should be displayed.
Width in pxNumber of pixels that should be used to show the information.
DescriptionDescription of the column name.
Visible columnsSpecifies the number of displayed columns (more columns can be displayed by adjusting the width of the resource planning columns).