Release Notes - Archive

Release notes for Axtension Visual Planning and Project Cost Control


Release 10.11.9.226

A new version of AXtension Visual Planning and Project Cost Control for Microsoft Dynamics 365 Finance and Operations has been released as of 17 April 2026.

Version numbers

The described release in this document supports the following versions.

Dynamics 365 for Finance and Operations Platform versionDynamics 365 for Finance and Operations application versionRelease version
Update 67 (7.0.7521.60) or later10.0.4510.11.9.226

Corrections

AXTvp

Bug | Trigger scheduler for customization
Scheduler method made available to be used by customization.

Bug | Performance issue opening Task planning
When opening the Task planning from the common menu it can take a lot of time to show loading projects after closing the preferences dialog at start up of the form.

AXTpcc

Bug | ETC value is being allocated to a non budget line in the progress and estimate date set
ETC shouldn't be calculated on non-budgeted lines.


Release 10.11.7.224

A new version of AXtension Visual Planning and Project Cost Control for Microsoft Dynamics 365 Finance and Operations has been released as of 30 March 2026.

Version numbers

The described release in this document supports the following versions.

Dynamics 365 for Finance and Operations Platform versionDynamics 365 for Finance and Operations application versionRelease version
Update 67 (7.0.7521.60) or later10.0.4510.11.7.224

Corrections

AXTvp

58830 - Project Monitoring & Control does not open
The Planning analytics report on the Project monitoring and control workspace could not be opened. This was caused by the fact that the embedded Power BI report was not in Direct Query mode anymore due to recent changes. This has been adjusted.

58547 - Move tasks with drag action "remaining capacity" for multiple projects
Independent of the selection of (different) projects, the drag action "remaining capacity" should work the same for multiple tasks.

58273 - Calculation of free float in task planning
Added a new field "Total float" to the critical path calculation and factpane in the Task planning. The value from the previous "Free float" field will now be stored in this new "Total float" field and the "Free float" will now hold the number of days a task can be delayed without delaying the start of its immediate successor. Fixed calculation in some scenario's with delays or weekends.

AXTpcc

58755 - CBS not set on firmed production orders
When firming a planned production order for a project related planned order, the CBS code was not set on the created production order. This has been changed so the CBS code is set now on firming the planned production order.

Improvements

AXTvp

56785 - Increase border thickness border colors in Gantt chart for production orders
In the Planning parameters on the Production tab in the General section add the new parameter 'Border width' after 'Use color from production order'. The new parameter can only be set when 'Use color from production order' is enabled.

58906 - Change TableGroup property for AXTvp_ReqTransItemTracking
The TableGroup property for table AXTvp_ReqTransItemTracking has been changed to 'Transaction' so the table will not be copied during a transactionless copy of data between environments.


Release 10.11.6.223

A new version of AXtension Visual Planning and Project Cost Control for Microsoft Dynamics 365 Finance and Operations has been released as of 25 February 2026.

Version numbers

The described release in this document supports the following versions.

Dynamics 365 for Finance and Operations Platform versionDynamics 365 for Finance and Operations application versionRelease version
Update 67 (7.0.7521.60) or later10.0.2177.1810.11.6.223

Corrections

AXTvp

58274 - Progress in project Task Planning remains 0%
Any part of the task planning should show the progress correctly.

58291 - Possibility to "deselect" roles within resource planning opening dialogue
Once a selection was made in the 'Human resource selection' section on the 'resource selection' dialogue on the resource planning, there was no easy way to open without a human resource selection. There is now an additional option 'None' available on the 'Human resource type' selection box.

58410 - Set up batch job for item availability check
When selecting one or more production orders, the action 'Check item requirement' can be executed. In the dialog the user can select if the action should be performed for the selected orders or to perform the action for a specific status and production order start date. When this action is scheduled as batch job, when opening the settings from the batch job, the settings where reset to default values. This has been changed so when opening the settings from the batch job the correct settings are shown.

58495 - On the resource planning, the color of the text inside a task box is always white
On the resource planning, the color of the text inside a task box was always white. This has been changed and text color (white or black) now depends on the background color.

58518 - Performance issue opening BOM form
With large BOM structures where most items have item tracking enabled with 'automatic recalculate item availability' it takes a lot of time to open the BOM. This is a fix when 'automatic recalculate item availability' is disabled that the manual should work correctly.

58072 - Open capacity overview out of resource planning leads to error
When opening the Capacity overview from Resource planning an error occurs when the Resource planning was opened with an equipment selection type set to Resource. This has been fixed.

57813 - Total effort to complete is not correctly updated on an activity without effort
When editing a published task in draft and changing the effort of the task then in case no progress or posted hours exists the total effort to complete should be the same as the new effort after publish

57116 - Performance issues with table AXTvp_ReqTransItemTracking
Table AXTvp_ReqTransItemTracking contains item tracking information related to requirements (ReqTrans). In many situations deleting records from table ReqTrans was done using methods that bypass table methods and table actions. As a result the records in table AXTvp_ReqTransItemTracking are not deleted automatically. As a result the table keeps growing causing performance issues in certain scenarios. Logic is added to delete records from this table when the related records from table ReqTrans are deleted. A cleanup scrip has been created also: under Production Control / Periodic Tasks / Planning and Control the item 'Cleanup item tracking data for net requirements' can be found. Running this will delete all records from table AXTvp_ReqTransItemTracking that do not have a related ReqTrans record anymore. This can be executed in batch also.

58640 - Recurring tasks not created correct
Create recurring tasks with a duration of more than 1 day should be possible Change a recurring task should not create duplicate tasks

AXTpcc

58300 - Progress and estimate dataset batch jobs mixes project transactions
Progress and estimate data sets created via the batch job shouldn't mix transactions from multiple unrelated projects in one data set

58377 - Old Data sets show multiple subtotal lines
Duplicate lines are shown in the simplified progress & estimates data set in case deviating records exists in the previous data set on the CBS/Cost group/Category combination. These deviating records are now removed from the previous data set to make sure only unique lines are shown for the current.

58462 - Realized costs incl subassembly roll up broken
Re-estimation of an underlying production order should not break the realized costs include subassemblies. This roll up should always be working completely.

58486 - Change CBS dropdown from list to tree view
The dropdown box for selecting CBS codes has two modes (list, tree). The default mode was list and is now changed to tree.

58508 - No actual costs in progress and estimate dataset
When using the old progress and estimate dataset with parameter 'Match transactions to budget' set to 'CBS code - cost group' or 'CBS code only', the actual costs were not included in the progress and estimate dataset. This issue has been resolved.


Release 10.11.5.222

A new version of AXtension Visual Planning and Project Cost Control for Microsoft Dynamics 365 Finance and Operations has been released as of 27 January 2026.

Version numbers

The described release in this document supports the following versions.

Dynamics 365 for Finance and Operations Platform versionDynamics 365 for Finance and Operations application versionRelease version
Update 67 (7.0.7521.60) or later10.0.2177.1810.11.5.222

Corrections

AXTvp

54055 - WBS template import moves project start date
Importing a WBS template should use the start date from the project and not move it back time. Task with relations should be scheduled from the start date of the project.

AXTpcc

58098 - Revenue lines not created automatically when creating Cost control budget
When a cost control budget is created from a project (based on WBS) the revenue lines on the created cost control budget were not generated automatically. This issue has been resolved

58103 - Added CBS Code Template to Project work breakdown structure - Draft entity
The CBS Code Template is added on the ProjProjectWBSDraftEntity (named Project work breakdown structure - Draft) data entity for import and export.


Release 10.11.4.221

A new version of AXtension Visual Planning and Project Cost Control for Microsoft Dynamics 365 Finance and Operations has been released as of 13 January 2026.

Version numbers

The described release in this document supports the following versions.

Dynamics 365 for Finance and Operations Platform versionDynamics 365 for Finance and Operations application versionRelease version
Update 67 (7.0.7521.60) or later10.0.114910.11.4.221

Improvements

AXTvp

57066 - Add fields for color to Released Products V2 Entity
Added fields for Gantt colors and pattern to Released Products V2 entity. Fields from Engineering TabPage of released product: Border color id, pattern color id, pattern type and task color id.

Corrections

AXTvp

57830 - Unexpected client error in resource planning
After moving an operation/job to another resource and in time and reselect operations/jobs an unexpected client error message pops up. The is now fixed

57846 - Task planning - changed information after updated in Edit activity
The task information configuration should not revert back to the previous settings when editing a task in the task planning.

57855 - Buttons New / Delete links active in edit activity form for published plan
The "New" and "Delete" buttons should be greyed out in the Edit activity form when a project is published. The functionality is already working as expected; you are unable to edit links when the project is published.

57917 - Operation scheduling percentage considered for job scheduled order
Operations scheduling percentage is not taken into consideration for a job scheduled production order/ jobs on resource level when being moved within resource planning

57528 - Error message: You are not authorized to access table 'Resource planning operation properties view'
The customer should be able to access the resource planner without the Production Planning license.

57790 - Error when selecting projects in Product Breakdown Structure - Project
When selecting a project through the Product Breakdown Structure - Project form, the following error was displayed: "Unsupported datasource used for PositionToRecord or PositionToRecordByValue." This occurred when a large number of projects were present. This issue has been fixed. Users can now open projects from the Product Breakdown Structure form without encountering this error.

57698 - Move operation scheduled production order on resource group strange behaviour
The option "use calendar for tasks" on the resource group is removed. Operation/job scheduled on a resource group now always use the calendar of the resource group. The visualization in the Resource planning shows the resource group calendar. The capacity on the resource group is calculated as the sum of the available capacity of the resource.

AXTpcc

57814 - Menu item "Cost Control parameters" is not visible
The menu item "Cost Control parameters" is not visible when only the configuration key "Axtension Planning & Control - Cost Control" has been enabled. This has been fixed.

57856 - Dataset - previous copied
On the Progress and estimates dataset change tooltip to "Copy the previous ETC to the current ETC" This option should copy the ETC from the previous dataset to the ETC value in the current data set.

57864 - Creating new budget version not working
A new budget version should be created when clicking the "New version" button.
57694 - PowerBI filtering on date does not work correctly
Filtering on date should work correct


Release 10.11.3.220

A new version of AXtension Visual Planning and Project Cost Control for Microsoft Dynamics 365 Finance and Operations has been released as of 17 December 2025.

Version numbers

The described release in this document supports the following versions.

Dynamics 365 for Finance and Operations Platform versionDynamics 365 for Finance and Operations application versionRelease version
Update 67 (7.0.7521.60) or later10.0.114910.11.3.220

Corrections

AXTvp

57660 - Resource planning takes operations scheduled end time 00:00 as 24:00
Dates and times of the operations within the Resource planning matches the times compared to the route itself when order is operation scheduled

57739 - Authorization error when trying to open Product breakdown structure
The PBS should be accessible even with the Tracking Dimension turned off.

57743 - Task planning - "An unexpected client error has occurred"
A manual column width adjustment should be possible without any error message.


Release 10.11.2.219

A new version of AXtension Visual Planning and Project Cost Control for Microsoft Dynamics 365 Finance and Operations has been released as of 10 December 2025.

Version numbers

The described release in this document supports the following versions.

Dynamics 365 for Finance and Operations Platform versionDynamics 365 for Finance and Operations application versionRelease version
Update 67 (7.0.7521.60) or later10.0.114910.11.2.219

Corrections

AXTvp

57482 - Moving production job in Resource planning extends duration
In some scenario's a production job time is extended when moving it in time in the Resource planning. Happens mainly when efficiency percentage on the resource < 100 %.

57460 - Error messages when reschedule production order with jobs that have 100% progress
When a production order has a job with 100% progress and move another job to pass it in the Resource planning it leads to error message 'Failed to fix all boundaries'.


Release 10.11.1.218

A new version of AXtension Visual Planning and Project Cost Control for Microsoft Dynamics 365 Finance and Operations has been released as of 2 December 2025.

Version numbers

The described release in this document supports the following versions.

Dynamics 365 for Finance and Operations Platform versionDynamics 365 for Finance and Operations application versionRelease version
Update 67 (7.0.7521.60) or later10.0.114910.11.1.218

Corrections

AXTvp

57140 - Resource planning displayed wrong when opened out of capacity overview on zoom "day"
In the Capacity Overview the zoom level is set to 'Day'. When open the Resource planning for a selected date from the Capacity overview the displayed period in the Resource planning should be one day before and after the selected date.

57267 - Visualization of clocked in symbol on resource planning
Fixed coding to visualize the clocked in symbol on task correct

57100 - Delivery status date format does not match user settings
Dates in the tooltip (i.e. for the delivery status) are not formatted according to the user settings. This issue has been resolved. Note: a changed user setting only becomes completely effective after the AOS has been restarted or after the AOD cache has been cleared. Only after one of these actions the asynchronous methods will use the changed settings

57101 - Bulk edit not available on new project
When creating a new project the bulk edit option was not available as long as the WBS was not published. This issue has been resolved.

57005 - Error when selecting roles for unassigned tasks
When selecting one or more roles for showing unassigned tasks in the Gantt preferences of the resource planning, when closing the preferences for this resulted in the error 'Initialize Unknown error'. This issue has been fixed. NOTE: Remove the usage data for class AXTvp_GanttPreferences_WBSResource if the error still occurs when opening the resource planning or when the Unassigned tasks dropdown in the Gantt preferences is not populated correctly.

57037 - Next operation blocks reschedule based on progress
When reschedule a production order based on progress it should not be blocked by one of its succeeding operations or jobs

57043 - Length issue with reference ID in task links
Increased the length of the HierarchyReferenceId from 15 to 60.

56292 - Allow extensibility on the AXTvp_ItemReqDateUpdate base enum
Due to the requirements of a customization feature the AXTvp_ItemReqDateUpdate base enum needs to be set to be extensible.

AXTpcc

57387 - Multiple transactions for the same Lot ID with different dates could result in incorrect data in the Progress and Estimate datasets
When a date within the range of these transactions was selected for creating the datasets, the system generated inaccurate data. This issue has been resolved. The Progress and Estimate datasets now correctly handle multiple transactions for the same Lot ID across different dates.

56900 - ETC Adjustment for Non-Budgeted Lines in Progress and Estimate Data Sets
When performing an adjustment request on a production budget specification, some totals displayed by line appear duplicated. This seems to occur because the production budget specification is saved on both the original line and the adjusted line. This occurs when you open a budget specification on the progress and estimate data form. Line totals should reflect only the adjusted calculation without duplicating original values. This has now been resolved.

56304 - ETC Adjustment for Non-Budgeted Lines in Progress and Estimate Data Sets
An issue was identified where adjustments to the ETC of non-budgeted lines in progress and estimate data sets were not saved correctly. This resulted in inaccurate cost recognition calculations. The issue has been resolved, and ETC adjustments are now stored and calculated as expected.


Major Release 10.11.0.217 (2025 H2)

A new version of AXtension Visual Planning and Project Cost Control for Microsoft Dynamics 365 Finance and Operations has been released as of 7 November 2025.

Version numbers

The described release in this document supports the following versions.

Dynamics 365 for Finance and Operations Platform versionDynamics 365 for Finance and Operations application versionRelease version
Update 67 (7.0.7521.60) or later10.0.114910.11.0.217

New Features

AXTvp

56928 - Visualize if a worker is clocked in on an operation - job
In the resource planning a new symbol is introduced to visualize when a job/task has been 'clocked in' on. The new clock symbol will show up in the left top corner instead of the start symbol when a user is clocked in on a production job/task. New symbol is also added to the legend on the infopart form to clarify this symbol.

53505 - Program Tracking
A new tracking dimension called Program ID is available to use. The tracking dimension is configurable and can be used on inventory transactions related to a project. Program ID is a standard tracking dimension in D365 FO, and needs to be enabled in the system configuration. The tracking dimension can be added to a tracking group which can be assigned to a released product. Any transactions originating from a project on items with the Program ID enabled, will inherit the tracking dimension related to the project.

54238 - Intercompany production orders in project task planning
Project managers can now view intercompany production orders directly in the Project Task Planning view. This enhancement improves visibility across legal entities, allowing users to track production orders in other companies that are pegged to project-related tasks in the project's legal entity. New Toggle in Chart Preferences: - A new option, "View intercompany production orders", has been added to chart preferences. Visual Integration: - When enabled, intercompany production orders appear as a single bar in the task planning chart. - The bar reflects the start and end date of the full production order. - Operations and jobs within the order are not shown separately. - Sub-assembly production orders are also not displayed. - The company prefix is added to the task name for clarity. - The bar is read-only and cannot be moved. - Users can view production order details, but cannot edit them.

37082 - Product Breakdown Structure
The product breakdown structure gives visibility of all requirements for inventory on the project. The product breakdown structure is based on the Item Requirements, Sales orders, Production orders and Purchase orders created against a project. In conjunction with using Planning Optimization, the net requirements for each item on the project will display in a hierarchical format on the Product Breakdown Structure. This is designed to give insight on all inventory items needed to complete a project, track the supply and indicate delays that could affect delivery.

AXTpcc

55818 - Budget templates
Budget templates can be created that can be used when creating a cost control budget from a project. The budget template ocntains the basic settings for a budget like the period code, number of periods, indirect cost setup etc. On the template a CBS template can be defined that is used when creating a budget based on the template. When a cost control budget is created from a project the option is added to create the budget based on a budget template. This will create a budget with the settings as specified in the template including copying the CBS template to the CBS of the budget. As part of the new feature the logic for creating the link between the WBS and the CBS has been improved. When adding a project to an existing budget (from project or directly on the budget) the option is added to create the link between WBS and CBS and to create the budget lines.

53444 - Import budget lines from excel file
A new feature is added for importing budget lines from an excel file. The import uses the standard data management functionality. The following functions are available in the cost control budget form as part of the feature: = 'Download excel template': Download an excel file that can be used to add the lines to be imported. The file contains header with the supported import fields (and no data lines) = 'Import from Excel': Imports an excel files with budget lines. The imported lines are stored in a budget version lines staging table and are linked to the budget. All lines are validated and validation state is also stored in the staging table. = Form 'Budget version lines to import': Shows a form with all pending imported lines. Form can be used to correct invalidate lines and actually transfer all imported liens to the budget Note: Function 'Import from excel' may fail with message "Import budget lines not available. Data entity for table AXTpcc_BudgetVersionLinesImportStaging not found". This message indicates that the data entity list must be refreshed (using Data Management workspace, Framework parameters).

Improvements

AXTvp

56432 - Connect selection for project activities in resource planning
In the resource planning the option 'Connect selection' is now also available for allocations on project activities. The 'Connect selection' action will reschedule the selected allocations in sequence of selection so that they connect to each other with regard of the activity start and end.

56449 - Multi select move project resource assignments
It is now possible to move a selection of resource assignments in time in the resource planning. The assignments are moved with following conditions / restrictions: - All movements are done relative to its origin - A resource assignment cannot be scheduled outside its activity boundaries - Movement is done by day not on a specific moment of a day

56452 - Show progress factpane in resource planning
In the task planning the progress factpane is available. This factpane has now been added to the resource planning also.

56149 - Highlight related planned orders
Improvement of the Highlight function: References in the Resource Planning view by extending the functionality to include planned orders. Previously, the hightlight option only highlighted related production orders. With this update, users can now also visualize referenced planned orders.

55732 - Configure task information for project tasks
On the Planning parameter form there is a new topic 'Configure task information' were the name, description and tooltip information can be configured for project activities, planned and production orders that are shown in the Task and Resource planning. For project activities in the Resource planning the project id was added as prefix but that is now removed to prevent that it could be added twice when already added to the configuration. For performance improvements the configuration will be cached which means that when modify the browser needs to be refreshed to show the correct configuration.

54658 - Define requirement fulfilled on project group level
The parameters 'Requirement fulfilled when' and 'Purchase / Production fulfilled when' can not be configured on project group level. In the item tracking calculation, system will check if the parameters are defined on the project group level. If no settings are found for the project group the general parameters will be used for the calculation.

55215 - Schedule mode 'Related' for planned production orders
The schedule mode 'Related' is now also available for planned production orders. When the schedule mode 'Related' (Referenced) is set and a planned production order task is moved in the resource planning all tasks for that planned production order and all tasks for related planned production orders must be moved accordingly (similar to how this functions for production orders).

55580 - Check on default project calendar when opening project task planning
We added a check that default calendar is set on project when opening the task planning. The planning will not be opened in case default calendar is not set and a message will be shown (equal to existing message when opening the work breakdown structure)

51611 - Add 'Cluster' as new 'Schedule mode'
The option 'Enable Cluster select' has been removed from the Arrange options. This option is replaced by a new schedule mode 'Cluster'. When the schedule mode is set to 'Cluster' when selection a operation that is part of a cluster all operations for the cluster are selected. When moving clustered operations in schedule mode 'Cluster' all clustered operations are scheduled together connected wihtou gaps.

51155 - Configure task information for project tasks
The information shown in the task information, task description and tooltip for project tasks is now configurable. On the Planning parameter form there is a new topic 'Configure task information' were the name, description and tooltip information can be configured for project activities, planned production orders and production orders that are shown in the Task and Resource planning. For project activities in the Resource planning previously the project id was added as prefix in the task information. This is removed as it is configuratble by the user now. For performance improvements the configuration will be cached which means that when modified the browser needs to be refreshed to show the correct configuration.

54318 - Additional fields in the production task configuration setup
Following fields can now also be configured in the production task configuration:

  • Setup time
  • Run time
  • Transit time
  • Queue time before
  • Queue time after
  • Process quantity This information is taken from the route.

AXTpcc

54951 - Total cost amount excluding indirect costs in WBS
Standard D365 shows the total cost amount including indirect costs on a WBS line. A new field is added showing the total cost amount excluding indirect costs on a WBS line (NOTE: this field is not available / visible in the Work breakdown structure form of standard D365). Additionally a new parameter is added to the Cost control parameters to control which amount is copied to the budget line (amount including / excluding indirect costs). If set to including indirect costs, cost control uses the standard D365 amount from the WBS (including indirect costs). If set to excluding indirect costs, cost control uses the cost amount excluding indirect costs.

54627 - Redesign budget status fact pane in gantt chart
The budget status fact pane in the gantt chart has been slightly redesigned. = Link "Create adjustment request" is always shown and enabled. A warning message ''No adjustment request created" will be shown if clicked and nothing to create = Link "Open adjustment requests" is shown but only enabled in case the CBS of the selected task is present in at least one pending budget adjustment request = The fact pane data is updated correctly after any changes to adjustment requests. When a user creates, edits, or deletes an adjustment request via the fact pane (bug fix) = The existing pending adjustment amount is added. The adjustment amount is added to both the total budget status section and the details section,

54837 - Performance generating and opening the progress and estimate dataset
Improvement have been made in the performance of generating and opening the progress and estimate datasets for budgets.

55562 - Deleted wbs tasks not included in created adjustment request on publishing
The adjustment request that is created on publishing a WBS did not include an adjustment line for CBS codes that were completely removed from the WBS. This is now changed

55563 - Include production budget lines in period distribution
The function 'Period distribution from WBS' now also applies to the production budget specification lines.

55564 - Added check on unit in budget adjustment request
A validation on non empty unit is added to budget adjustment request. The validation is triggered upon: = Submitting to workflow = Posting the adjustment request

55566 - Include production budget specification when using Copy/Paste in WBS
In the WBS tasks can be copied and pasted. If one of the copied tasks has a production budget specification that specification is now also copied and linked to the pasted task. 

55581 - Redesign form Copy estimated cost and revenue lines to budget
The form 'Copy estimated cost and revenue lines to budget' shows cost and revenue lines has been redesigned. Following adjustments have been made: = Dialog size is increased = Fields shown on the grid = It is now possible to select the individual lines to include

53580 - Refactoring Axtension Planning & Control - Subcontractor management
The Axtension Planning & Control- Subcontractor management solution was refactored to remove the dependency on Axtension Invoice Processing. Axtension Invoice Processing was changed so it now integrates with Axtension Planning & Control - Cost Control and with Axtension Planning & Control - Subcontractor management dynamically, without a hard dependency on Axtension Planning & Control models.

Corrections

AXTvp

57051 - Error when manually rescheduling operations with resource efficiency less than 100%
On a resource with efficiency less then 100% scheduling an operation or job should not give an error but schedule correctly with the reduced efficiency. Error is not showing anymore.

56600 - Dragging unassigned project task to production resource causes disappearance
In the Resource Planning, dragging an unassigned quotation task (not linked to any role) to a production resource previously caused the task to temporarily indicate that an update was in progress. However, once the update completed, the task would unexpectedly disappear from the resource planning. This issue has been resolved. Unassigned quotation tasks now remain visible and correctly assigned after being moved to a production resource.

AXTpcc

55603 - Actual indirect costs not included when parameter 'Match transactions to budget' is set to 'CBS code - Cost group'
The issue has been fixed that actual indirect costs were not correctly handled in case parameter 'Match transactions to budget' is set to 'CBS code - Cost group'.

55737 - Hide 'Budget Status' fact pane when 'Show Budget Status' is disabled
The fact pane 'Budget status' on the gantt chart was always visible, independent of the setting in chart preferences. This issue is now fixed

55576 - Total estimated and Realized cost amount are not editable on Production budget specification
From a progress and estimate dataset a production budget specification progress form can be opened. The fields 'Total estimated' and 'Realized cost amount' are not editable anymore. The Total field is now correctly populated based on the sum of the line items.

5567 - Fix cost calculation on production budget specification for quantities greater than 1
On the production budget specification the production costs can be calculated. In the calculation the quantity for which the costs are calculated is specified. When finished the total costs were copied into the production budget specification as the per unit costs, independent of the quantity used int the calculation. This is now fixed